Employment
The guaranteed inter-professional minimum wage (SMIG) and the guaranteed minimum agricultural (SMAG) sont institués par le décret n° 73‐247 du 26 mai 1973. wage (SMAG) were fixed by decree n ° 73‐247 of May 26, 1973.
The wage concerns workers of both sexes who are at least 18 years old.
The transport allowance is fixed, for employees paid at the minimum wage in non-agricultural sectors, according to the labour code provision, at 36,112 TND per month in accordance with decree n ° 82-503 of March 16, 1982 and amended by the government decree n ° 2015-1764 published in the JORT (Official National Gazette) N ° 91 of 09 November 2015.
SMIG
Scheme | Monthly salary | Hourly salary |
---|---|---|
40 Hours | 365,732 TND | 2110 millimes |
48 Hours | 429,312 TND | 2064 millimes |
SMAG
Scheme | Salary per day |
---|---|
Rate (common) | 16,512 TND |
Specialized workers | 17,392 TND including a technical bonus of 880 millimes |
Skilled workers | 16,168 TND including a technical bonus of 1 656 millimes |
SALARY INCREASE
In non-agricultural activities under the labour code and not governed by sectoral collective agreements or by specific public enterprise by-laws, the basic wages of workers are increased as follows:
WORKERS CATEGORY | 48H / WEEK WORK SCHEME | 40H / WEEK WORK SCHEME | ||
---|---|---|---|---|
Hourly increase | Monthly increase | Hourly increase | Monthly increase | |
Executing employees, excluding minimum wage workers | 199 millimes | 41,392 dinars | 199 millimes | 34,493 dinars |
Foremen | 228 millimes | 47,424 dinars | 228 millimes | 35,013 dinars |
Executives | 298 millimes | 61,984 dinars | 298 millimes | 51,652 dinars |
Hours worked over the normal weekly duration are considered overtime.
These hours are remunerated with reference to the basic hourly wage increased according to the following rates and according to the activity sector:
- Agricultural sector: 25% for working hours over the daily working time
- Non-agricultural sector:
- Part-time work scheme: 50%
- Full-time work scheme of 48 hours per week: 75%
- Full-time working scheme of less than 48 hours per week: ≤ 48 hours per week 25%
- Full-time working scheme of less than 48 hours per week: more than 48 hours per week 50%
Electricity cost
Alternative power frequency | 50 Hz | |
Low voltage | 220 / 380 V (± 10%) | |
Medium voltage (2nd category) | 30 kV (± 7%) generally (10 kV and 17 kV in some areas) |
Rates | Charges | Energy price (millimes / KWh) | ||||
Power mil / KW / Month | Day | morning peak summer | Evening peak | Evening peak Night | ||
Four hourly shifts | 11000 | 243 | 373 | 335 | 210 |
Rate | Sector | Power charge (1) (Mill / kVA / month) | Energy price for each monthly consumption phase (Mill / kWh) (1) (2) | |||||
1-50 | 51-100 | 101-200 | 201-300 | 301-500 | 500 et plus | |||
Economic phase (1 and 2 kVA and C ° ≤100 kWh / month)) | Residential (3) | 700 | 62 | |||||
Residential(4) | 108 | |||||||
Residential(5) | 162 | |||||||
Economic phase (1 and 2 kVA & C°> 100 kWh/month) | Residential | 700 | 176 | 218 | 341 | 414 | ||
Normal phase (> 2 kVA) | Non Residential | 176 | 240 | 333 | 391 |
Rate | Charges | Energy price 19 (millimes / KWh) 20 | |||||
Mil / Ab / Month subscription | Power mil / KVA / Month | Day | Peak | Evening peak | Night | ||
Public lighting | 900 | 234 | |||||
Heating-water21 | 500 | 341 | Erase 22 | Erase | 341 | ||
Heating and air conditioning | 700 | 414 | |||||
Irrigation | Constant | 300 | 700 | 164 | |||
Three hourly shifts | 1000 | 121 | NA | 391 | 106 |
Natural gas
Low pressure | Sector | Subscribed flow (therm / h) | Flow charges (1) (mill / th-h-month) | Energy price | ||
---|---|---|---|---|---|---|
mill/th | mill/m3 | |||||
BP1 | C≤ 300 th/month 1 à 300 th/month (1 à 30 m3 / month) |
Residential | 50 et 100 | 15 | 24.3 | 231 |
Non résidentiel | 25.5 | 243 | ||||
300 < C <= 600 th/month 1 à 600 th/month (1 à 60 m3 / month) |
Residential | 50 et 100 | 15 | 35.8 | 341 | |
Non Residential | 37.5 | 357 | ||||
600 < C <= 1 500 th/month 1 à 1 500 th/month (1 à 150 m3 / month) |
Residential | 50 et 100 | 15 | 47 | 447 | |
Non Residential | 51.1 | 486 | ||||
C>1 500 th/mois 1 to 1 501 th/month and more (1 to 151 m3 / month) |
Residential | 50 et 100 | 15 | 58.6 | 557 | |
Non Residential | 66.2 | 629 | ||||
BP2 | Residential | 50 et 100 | 15 | 58.6 | 557 | |
Non Residential | 66.2 | 629 |
ABREVIATIONS
Th : Thermal - Mill :Tunisian millimes - VAT : value added tax (1) VAT is applied at the rate of 19% on charges and energy prices excluding taxes Increase in subscribed flow: in case of an increase in the subscribed flow (with or without rate change), the reinforcement cost is calculated on the additional flow.
Rates | Subscribed flow (therm / h) | Charges | Energy price (1) Subscription (mill / th) | ||
---|---|---|---|---|---|
Subscription (DT / ab-month) | Flow (mill / thh-month) | ||||
Medium pressure | MP1 | 1 000 à 4 000 | 20 | 300 | |
MP2 | 6 000 à 30 000 | 20 | 450 | ||
Cement (Grey cement) | 1 000 à 30 000 | 20 | 600 | 1.032 x Pg | |
58.8173 (5) |
ABREVIATIONS
h : Hour
Ab : Subscription
Th : Thermal
Mill : Tunisian Dinar
DT : Dinar Tunisien
TVA : Value added tax
Pg : Purchase price of natural gas in millimes / therm
(1) VAT is applied at the rate of 19% on charges and energy prices excluding taxes In case of an increase in the subscribed flow (with or without rate change), the cost of reinforcement is calculated on the additional flow.
Rate | Subscribed flow (therm / h) | Charge (1) | Subscription (DT / sub-month) | |||
---|---|---|---|---|---|---|
Flow (mill / th-h-month) | Energy price (1) (mill / th) | |||||
High pressure | HP1 | 1 000 à 4 000 | 300 | 700 | 52.2 | |
HP2 | ≤2 000 Tep/ month | >30 000/td> | 300 | 700 | 58 | |
>2 000 Tep/ month | 70 | |||||
Cement (grey cement) (2) | >10 000 | 300 | 700 | 1 x Pg | ||
56.9935 (2) |
ABREVIATIONS
Tep : 10 000 therms
h : Hour
Ab : Subscription
Th : thermal
Mill : Tunisian millimes
DT : Tunisian Dinar
TVA : Value added tax
Pg : Purchase price of natural gas in millimes / therm
(1) VAT is applied at the rate of 19% on charges and energy prices excluding taxes.
(2) As of June 1, 2018: - rates are revised during the month of June of each year on the basis of compatible data from STEG for the previous year - Energy price is fixed on the basis of the purchase price of natural gas equal to 93.3247 mill / th (which corresponds to the average purchase price of natural gas for the year 2019) In case of an increase in the subscribed flow (with or without rate change), the cost of reinforcement is calculated on the additional flow.
Telecommunication
The current telecommunication network in Tunisia is considered among the most developed and
efficient in the region. Tunisia is willing to become an international digital destination
aimed at consolidating and strengthening ICT use in the business sectors.
Foreign companies can set-up communication links with almost any point in the world at
advantageous costs thanks to modern and fully digital networks using optical fibres, SDH,
ATM, ADSL and other extended wireless bandwidths, which can provide high capacity and speed
for voice and data transmissions. The fixed, mobile and satellite communication
infrastructures provided by the four telephone companies and Internet service providers
offer a complete and diversified range of local and international services ranging from
audio, video and data services to any other advanced communication service.
Mobile network operators | 4 |
Internet service providers | 12 |
Fixed Volp? | 2 988 abonnements |
Mobile telephone outreach rate | 127,7 % |
Internet subscriptions | 5,6 millions |
Internet outreach rate | 64 % |
Oil derivatives
The price revision of certain oil products is governed by the decree of the Ministers of Energy, Mines and Energy Transition and Finance, of March 31, 2020, appointing a technical commission responsible for setting and monitoring the selling prices of imported finished oil products and those refined locally.
Rates in effect from 1st February 2022
PRODUCT | PUBLIC SALE PRICE | |
---|---|---|
Super unleaded gasoline | 2,330 dinars / liter | |
Kerosene | 0,810 dinars / liter | |
Gas-oil | 1,790 dinars / liter | |
Gas-oil 50 PPM | 2,010 dinars / liter | |
Heavy fuel oil n ° 2 | 510 dinars / ton | |
LPG for Vehicles | 0,698 dinar /Kg | |
Liquefied petroleum gas (LPG) for domestic use | ||
3 kg load | 1,860 dinars | |
5 kg load | 3,015 dinars | |
6 kg load | 3,590 dinars | |
13 kg load | 7,700 dinars | |
Liquefied petroleum gas (LPG) for industrial use | ||
25 kg load | 32,925 dinars | |
35 kg load | 46,095 dinars | |
Bulk LPG for non-domestic use | 1 106,750 dinars/tonne | |
Bulk liquid propane | 1 138,416 dinars/tonne |
Drinking water
The service provider is the National Water Exploitation and Distribution Company (SONEDE). Applications are submitted to the SONEDE office in the project district.
Industrial use | Tourist use (Hotel industry) | |
---|---|---|
Quarterly consumption | Price in TND / m3 | Price in TND / m3 |
C≤ 20 m3 | 0,200 | 1.490 |
21 m3 < C ≤ 40 m3 | 0,495 | |
41 m3 < C ≤ 70 m3 | 0,620 | |
71 m3 < C ≤ 100 m3 | 0,940 | |
101 m3 < C ≤ 150 m3 | 1,110 | |
151 m3 < C ≤ 500 m3 | 1,430 | |
C > 500 m3 | 1,490 |
Counter diameter | Fixed price (TND / quarter) | |
12 - 15 mm | 5,050 | |
20 mm | 9,370 | |
30 mm | 17,310 | |
40 mm | 31,800 | |
De 60 mm à 80mm | 80,800 | |
100 mm | 130,000 | |
150 mm | 338,700 |
Sanitation
The service provider is the National Sanitation Office (ONAS). Applications are submitted to ONAS agencies in the district where the project is located. The quarterly sanitation rates are as follows:
Industrial use | Prices in dinars | |
---|---|---|
Variable | Fixed | |
Industrial discharge in compliance with discharge standards in the public sewerage network | 1,215/ m3 | 12,425 |
Industrial discharge in compliance with discharge standards into the natural environment | 0,880/ m3 | 12,425 |
Industrial discharge exceeding the discharge standards in the public sewerage network | 1,215 +(Q27*585) | 12,425 |
Industrial discharge and polluting activity not connected to the public sanitation network | 0,880/ m3 | 12,425 |
Tourist use | ||
General case | 1,540 | 12,425 |
Goods transportation
The rates for transporting 20-foot containers from the Port of Radès to the customer's factory are approximately as follows:
Containers loaded in one way, empty on the way back (in TND)
Distance in KM | 150 | 300 | 450 |
---|---|---|---|
Container ≤ to 12 T | 160 | 210 | 260 |
Container > to12 T | 300 | 400 | 500 |
Containers loaded in both ways (in TND)
Distance in KM | 150 | 300 | 450 |
---|---|---|---|
Container ≤to 12 T | 190 | 250 | 310 |
Container > to 12 T | 350 | 470 | 590 |
The rates for transporting various goods from station to station are based on the distance:
Distance in KM | Price in dinars |
---|---|
up to 50 Km | 3,100 + 0,0295 * D |
From 51 to 110 Km | 2,180 + 0,0282 * D |
From 111 to 200 Km | 2,290 + 0,0272 * D |
Over 200 Km | 2,150 + 0,0309 * D |
As land transport is liberalized in Tunisia, each company in the sector applies its own prices. The average price is between 0.070 and 0.080 TND per ton and per kilometre. These prices decrease every time the distance increases.
Shipping destinations | 20-foot containers in DT | 40-foot containers in DT |
---|---|---|
France (Marseille) | 620 | 1200 |
Italy (Livourne) | 780 | 1550 |
Spain | 750 | 1500 |
North Europe 780 1 550 | 780 | 1550 |
Morocco | 1850 | 3700 |
Destination | Price |
---|---|
Tunis - Paris | 0,650 TND/kg |
Tunis - Brussels | 0,680 TND/kg |
Tunis - Rome | 0,610 TND/kg |
Tunis - Frankfurt | 0,690 TND/kg |
Tunis - Munich | 0,690 TND/kg |
Tunis - Milan | 0,620 TND/kg |
Tunis - Marseille | 0,470 TND/kg |
Production costs and positioning
Gas cost for industrial use is given per cubic meter. The location with the lowest unit costs for industrial gas is Tunisia with $ 0.1498 per cubic meter, followed by Turkey and Italy.
Country | Rank | Cost (m3 ) |
---|---|---|
Tunisia | 1 | 0.15 |
Turkey | 2 | 0.24 |
Italy | 3 | 0.31 |
Romania | 4 | 0.33 |
Germany | 5 | 0.37 |
Morocco | 6 | 0.37 |
France | 7 | 0.39 |
The public price of electricity is the average price of electricity per kWh supplied to industrial customers, all costs and charges included. The country with the lowest electricity unit costs is Tunisia with costs of 0.0770 USD per kWh, followed by Turkey and Romania.
Country | Rank | Cost (m3) |
---|---|---|
Tunisia | 1 | 0.08 |
Turkey | 2 | 0.09 |
Roumania | 3 | 0.09 |
Morocco | 4 | 0.12 |
France | 5 | 0.14 |
Italy | 6 | 0.17 |
Germany | 7 | 0.26 |
Contact person
Haithem Hammami
E-mail: haithem.hammami@nulltia.gov.tn
Contact: +216 (70) 248 148 Ext. 206